Aerospace Control and Guidance Systems Committee

Announcements


You must first log in to access prior meeting presentations, register for a meeting, or nominate some for the Ward Award.


If you do not have a login account, or cannot remember the email address associated with your account, please click on the Application Form link below.

 
 

Login

 

E-mail: 

 

Password: 


Forgot your password?

Application Form


 

Site Search

Search our site:
 
 

Upcoming Events


Register for Meeting 133
(please log in first)

 
 

Photos


Meeting Highlights New!

Subcommittee S

 
 

Prior Meetings

Abstracts may be viewed by anyone. Presentations are only available to active members who have logged in.

Meeting 133
(coming soon)

Meeting 132
(coming soon)

Meeting 131

Meeting 130

Meeting 129

Meeting 128

Meeting 127

Meeting 126

Meeting 125

Meeting 124

Meeting 123

Meeting 122

Meeting 121

Meeting 120

Meeting 119

Meeting 118

Meeting 117

Meeting 116

Meeting 115

Meeting 114

Meeting 113

Meeting 112

Meeting 111

Meeting 110

Meeting 109

Meeting 108

Meeting 107

Meeting 106

Meeting 105

Meeting 104

Meeting 103

Meeting 102

Meeting 101

Meeting 100

Meeting 99

Meeting 98

Meeting 97

Meeting 96

Meeting 95

Meeting 94

Meeting 93

Meeting 92

 
HomeWard Memorial AwardPlanning Advisory BoardDownloadsConstitution and By-LawsAboutHistoryContact Us

  ← Return to agenda

MeetingACGS Committee Meeting 106 - La Jolla - October 2010
Agenda Location6 SUBCOMMITTEE D – DYNAMICS, COMPUTATIONS, AND ANALYSIS
6.3 ARES Demonstration Vehicle Test Results
TitleARES Demonstration Vehicle Test Results
PresenterNASA Langley DSCB Representative
Available Downloads*presentation
*Downloads are available to members who are logged in and either Active or attended this meeting.
AbstractAres I-X Flight Test System ID Results

On 28 October 2009, NASA conducted the Ares I-X flight test, which was a pre-cursor to the planned Ares I Crew Launch Vehicle. Among the primary objectives of the flight test were to demonstrate control of a vehicle dynamically similar to the Ares I and to characterize the integrated vehicle roll torque throughout first stage flight.

One of the innovative approaches of this test was the injection of programmed test inputs (PTI) into the thrust vector control (TVC) commands to facilitate post-flight system identification and analysis. The objective of these maneuvers and analyses was to identify and validate pre-flight models for control stability margins, aerodynamics, and structural dynamics. While these techniques have been used previously in flight test campaigns for a wide variety of aircraft, this is the first time they have been employed on a launch vehicle.

The design of the PTI maneuvers will be discussed, along with analysis results to date including the control stability margins and the roll dynamics.



Copyright © 2024 | Question? webmaster@acgsc.org